Tin tức

Da Nang: What roads are banned from circulation on the occasion of APEC?

From 3-12 / 11, there will be 30 roads in Da Nang city banned from traffic, nearly a dozen banned parking routes, Son Tra peninsula is also blocked ... to serve APEC 2017.

Chairman of the People's Committee of Da Nang City, Huynh Duc Tho, has just approved the traffic flow plan for the 2017 APEC Summit Week. Accordingly, Da Nang will prohibit dump trucks (dump trucks). 24 / 24h on all roads in the city of Da Nang, except routes: Tunnel Hai Van - Tuy Loan, Highway 14B (The section from Hoa Cam overpass to Tunnel Hai Van - Tuy Loan), Highway 1 (from overpass Hoa Cam reaches Quang Nam province), the Da Nang - Quang Ngai highway from November 3 to 12. Prohibit trucks (including tractors, semi-trailers, concrete-mixing vehicles, truck-mounted trucks, trucks with a tonnage of over 1.5 tons), passenger cars with over 16 seats, sanitary vehicles The environment, transporting garbage and wastes (except for cars with APEC badges) operates from 5am to 11pm from November 5 to 12.

About 30 routes will also be banned on this occasion. Specifically, in the areas of Son Tra district, Ngu Hanh Son prohibits traffic: Hoang Sa, Vo Nguyen Giap, Truong Sa, Vo Van Kiet, Nguyen Van Thoai, Ho Xuan Huong, Nguyen Duc Thuan, Minh Mang, An Nong, Nam Ky Khoi Nghia (from An Nong to Tran Dai Nghia). Hai Chau and Thanh Khe districts banned traffic on the roads: February 3, Bach Dang, Tran Phu, September 2, Cach Mang Thang Tam, Ham Nghi, Le Dinh Ly, Nguyen Tri Phuong, Nguyen Huu Tho and Trung Nu. Vuong, Nguyen Van Linh, Duy Tan, Tran Thi Ly and the Dragon bridges, Tran Thi Ly and Tien Son bridges.

Particularly on November 10 and 11, Da Nang will ban additional types of trucks (including tractors, semi-trailers, concrete trucks, truck cranes, and trucks with a tonnage of over 1.5 tons. ), sanitation vehicles, transporting garbage and waste, passenger cars with a height of over 3.5m, passenger cars with over 16 seats, circulating on Le Van Hien, Ngu Hanh Son, Ngo Quyen and Yet Kieu roads .

Da Nang assigns functional units to put up a ban on parking from November 5 to 12 on routes: Hoang Sa, Vo Nguyen Giap, Truong Sa, Vo Van Kiet, Nguyen Van Thoai and Bach Dang (from Dragon Bridge section to Nguyen Du), Tran Phu (from Nguyen Du to Dragon Bridge), September 2, Cach Mang Thang Tam (from Hoa Xuan Bridge to Nguyen Tri Phuong Bridge), Nguyen Van Linh, Duy Tan and Tran Thi Ly. In addition, depending on the actual situation, the traffic police will prohibit the road or allow the circulation of some sections to serve the delegation and temporary traffic needs.

Blockade Son Tra Peninsula, stop many activities

According to Chairman of Da Nang People's Committee Huynh Duc Tho, in days 4-5, 11-12 / 11, Han River Bridge stopped spinning, Dragon Bridge stopped spraying water / fire. Activities on the Han River are temporarily suspended from November 9-11.

Talking to Traffic Newspaper, Mr. Tran Chi Cuong, Deputy Director of Da Nang Tourism Department, said that from November 2 to 12, the whole area of ​​Son Tra peninsula was blockaded to exclusively for APEC. This is an area where many important activities of heads of countries and APEC members take place. Accordingly, only vehicles of the delegation attending APEC, functional departments are allowed to enter and exit the peninsula. Civil activities, people and vehicles not related to APEC 2017 will not be allowed to go up and down Son Tra peninsula. Da Nang prohibits travel transport business units, prohibits travel service providers from organizing passenger transport activities and transporting vehicles to Son Tra peninsula to ensure security. during the 2017 APEC Summit.

According to Mr. Cuong, the Department instructed and disseminated the regulations of international reception practices to officials, employees of tourism, travel and accommodation industries without disclosing schedule and time information. accommodation, menus, personal photos of guests out; Do not take photos without permission from the guests, do not upload images of union members to social networks ... With people outside, all activities should ensure civilization, courtesy, diplomacy when meet APEC delegates.

How to get in and out of Hoi An airport?

On the occasion of APEC 2017, the trucks, passenger cars with more than 16 seats entering and leaving Da Nang international airport (except for cars with APEC badges) circulate in the following directions: Dien Bien Phu - Bridge cross the Hue - Truong Chinh - Le Dai Hanh - Nguyen Huu Tho - Duy Tan junction - the airport and vice versa or Tran Dai Nghia - Vo Chi Cong - Nguyen Tri Phuong bridge - Nguyen Huu Tho - Duy Tan - Danang airport.

Types of cars with more than 16 seats going to Hoi An City go on the following routes: Thuan Phuoc Bridge (for cars with a total weight of under 10 tons) - Le Duc Tho - Yet Kieu - Ngo Quyen - Ngu Hanh Son (or Tran Hung Dao - Chuong Duong - Bui Ta Han) - Le Van Hien - Tran Dai Nghia - Hoi An and vice versa. Nguyen Tri Phuong Bridge - Vo Chi Cong - Tran Dai Nghia - Hoi An and vice versa.

Hung Anh Hotel Danang
Add: No. 23 – 25 Vo Van Kiet Street, Ngu Hanh Son District, Da Nang City, Viet Nam  |  Hotline: 0935 31 81 88
Tel: 02363 86 79 79 0935 31 81 88 - 0931 907 688     |   Fax: 02363 687979         |  Email: info@hunganhhotel.com  |  Website: www.hunganhhotel.com